  • Union Budget 2021-22 has identified the monetisation of operating public infrastructure assets as a key means for sustainable infrastructure financing.
  • Towards this, the Budget provided for the preparation of a ‘National Monetisation Pipeline (NMP)’ of potential brownfield infrastructure assets. NITI Aayog in consultation with infra line ministries has prepared the report on NMP.
  • NMP aims to provide a medium-term roadmap of the programme for public asset owners; along with visibility on potential assets to the private sector.

The report on NMP has been organised into two volumes.

  • Volume I is structured as a guide book, detailing the conceptual approaches and potential models for asset monetisation.
  • Volume II is the actual roadmap for monetisation, including the pipeline of core infrastructure assets under Central Govt.

Framework

  • The pipeline has been prepared based on inputs and consultations from respective line ministries and departments, along with the assessment of total asset base available therein.
  • Monetization through Disinvestment and monetization of non-core assets have not been included in the NMP.
  • Further, currently, only assets of central government line ministries and CPSEs in infrastructure sectors have been included. The process of coordination and collation of asset pipeline from states is currently ongoing and the same is envisaged to be included in due course.

The framework for monetisation of core asset monetisation has three key imperatives:

This includes the selection of de-risked and brownfield assets with a stable revenue generation profile with the overall transaction structured around revenue rights. The primary ownership of the assets under these structures, hence, continues to be with the Government with the framework envisaging a hand back of assets to the public authority at the end of transaction life.

Estimated Potential

  • Considering that infrastructure creation is inextricably linked to monetisation, the period for NMP has been decided so as to be a co-terminus with the balance period under National Infrastructure Pipeline (NIP).
  • The aggregate asset pipeline under NMP over the four-year period, FY 2022-2025, is indicatively valued at Rs 6.0 lakh crore.
  • The estimated value corresponds to ~14% of the proposed outlay for Centre under NIP (Rs 43 lakh crore). This includes more than 12 line ministries and more than 20 asset classes.
  • The sectors included are roads, ports, airports, railways, warehousing, gas & product pipeline, power generation and transmission, mining, telecom, stadium, hospitality and housing.
  • The top 5 sectors (by estimated value) capture ~83% of the aggregate pipeline value. These top 5 sectors include: Roads (27%) followed by Railways (25%), Power (15%), oil & gas pipelines (8%) and Telecom (6%).
  • In terms of annual phasing by value, 15% of assets with an indicative value of Rs 0.88 lakh crore are envisaged to be rolled out in the current financial year (FY 2021-22). However, the aggregate, as well as year-on-year value under NMP, is only an indicative value with the actual realization for public assets depending on the timing, transaction structuring, investor interest etc.
  • The assets and transactions identified under the NMP are expected to be rolled out through a range of instruments. These include direct contractual instruments such as public-private partnership concessions and capital market instruments such as Infrastructure Investment Trusts (InvIT) among others. The choice of instrument will be determined by the sector, nature of the asset, timing of transactions (including market considerations), target investor profile and the level of operational/investment control envisaged to be retained by the asset owner etc.
  • The monetisation value that is expected to be realised by the public asset owner through the asset monetisation process, may either be in form of upfront accruals or by way of private sector investment.
  • The potential value assessed under NMP is only an indicative high level estimate based on thumb rules. This is based on various approaches such as market or cost or book or enterprise value etc. as applicable and available for respective sectors.

Implementation & Monitoring Mechanism

  • As an overall strategy, significant share of the asset base will remain with the government.
  • The programme is envisaged to be supported through necessary policy and regulatory interventions by the Government in order to ensure an efficient and effective process of asset monetisation. These will include streamlining operational modalities, encouraging investor participation and facilitating commercial efficiency, among others. Real-time monitoring will be undertaken through the asset monetisation dashboard, as envisaged under Union Budget 2021-22, to be rolled out shortly.
  • The end objective of this initiative to enable ‘Infrastructure Creation through Monetisation’ wherein the public and private sector collaborate, each excelling in their core areas of competence, so as to deliver socio-economic growth and quality of life to the country’s citizens.

Source: PIB


Oceanic Anoxic Event 1a and MASS EXTINCTION

Oceanic Anoxic Event 1a from the Paris Basin (Environment) Paper-3 PMP OAE 1a refers to a period during the Cretaceous Period (145 million years ago and ended 66 million years ago) when Earth's oceans became depleted of oxygen, causing a significant disruption in marine life.  Cause: The event is believed to have been

Viksit Panchayat Karmayogi (Good governance)

Viksit Panchayat Karmayogi (Good governance) Governance GS PAPER-2 PMP Dr. Jitendra Singh launched the ‘Viksit Panchayat Karmayogi’ initiative on Good Governance Day, celebrated to mark the 100th birth anniversary of former Prime Minister Atal Bihari Vajpayee. The initiative, which is part of the broader ‘Prashasan Gaon

Major programmes to control Air Pollution

Major programmes to control Air Pollution National Clean Air Programme? It was launched by the Ministry of Environment, Forests and Climate Change (MoEFCC) in January 2019. It is the first-ever effort in the country to frame a national framework for air quality management with a time-bound reduction target. The

Air pollution and Air quality Measures in India

Air pollution and Air quality Measures in India (Environment) GS Paper-3 P-M-P Air pollution may be defined as the presence of any solid, liquid or gaseous substance including noise and radioactive radiation in the atmosphere in such concentration that may be directly and/or indirectly injurious to humans or other l

Geopolitical Significance of Ports

Geopolitical Significance of Ports (IR)  Act as geopolitical assets: Ports enhance the projection of strategic reach, which helps strengthen the country’s control over important sea and energy supply routes.  E.g. Indian Navy’s staging base at Agalega Islands will enable marine patrols

Toppers

Search By Date

Newsletter Subscription
SMS Alerts

Important Links

UPSC GS Mains Crash Course - RAW Prelims Answer Key 2024