×

UPSC Courses

DNA banner

DAILY NEWS ANALYSIS

GS-III :
  • 28 August, 2020

  • 10 Min Read

A five-point action plan to manage waste effectively

A five-point action plan to manage waste effectively

Introduction:

  • Years of neglect, lack of foresight and complete absence of urban planning has left India staring at mountains of waste-landfills, waste-choked drains, water bodies and rivers. This is called “legacy waste”, a cumulative consequence of decades of neglect and lack of foresight.

Landfills in India:

  • There are about 48 recognised landfills across India, together covering nearly 5,000 acres of land, with a total land value of about Rs 100,000 crore.
  • India generates about 275 million tonnes of waste per year.
  • With current waste treatment rates of about 20-25%, this leaves majority of waste untreated, in a heap, on landfills, and an equal amount in drains and river bodies. Example: the Deonar dumpsite in Mumbai. This is the oldest landfill in India, and was set up in 1929.
  • It covers about 325 acres, receives 5,500 metric tonnes of waste, 600 metric tonnes of silt and 25 tonnes of bio-medical waste daily. Mumbai city generates about 7,500 metric tonnes of waste daily.
  • The Brihanmumbai Municipal Corporation (BMC) has recently commissioned a waste-to-energy (WTE) plant which will treat 600 metric tonnes of municipal solid waste every day.
  • India generates the most waste globally, and by 2050, our waste generation will double.

River pollution:

  • Drains and water bodies, emptying out into Indian rivers, also carry with them an unimaginable amount of waste.
  • The Ganga is among the top 10 polluted rivers in the world, together accounting for 90% of the total ocean plastic pollution.
  • India faces a seemingly insurmountable challenge of treating and getting rid of the legacy waste, with simultaneous and continuous accumulation of fresh everyday waste.
  • Central, state, city and municipal governments, over decades, have not been able to prevent this situation, nor deal with its scale.
  • For a country the size of India, there are about 92 large WTEplants. Of these, only a small fraction is operational, and the plants that are operational, run at suboptimal capacity.
  • State governments have, so far, invested an estimated Rs 10,000 crore in such plants.

Steps to be taken:

  • First, municipalities need to have access to affordable technology which has been piloted and validated under Indian conditions.
  • Today, most of the technology/equipment needed for waste management is imported, expensive and often not suited in our varied local situations.
  • India needs affordable, decentralised, customised solutions for its land-constrained complex city matrix.
    • Amphibian equipment to clean water bodies is imported and can work well for large water bodies.
  • Indigenisation of design and manufacturing of such equipment for smaller drains and water bodies is essential.
  • Robotic long-hand scavenging machines to unclog drains, booms which filter and prevent waste in our drains entering a larger water body are some examples, where Atmanirbhar Bharat (self-reliant India)needs to kick in immediately.
  • Entry to drains in India is choked with pan masala, shampoo sachets, chips/kurkure packets and so on.
  • These are major problems unique to India and require both community and technological solutions.
  • Ease of procurement: Evolving a less cumbersome process for the procurement of technology and equipment is imperative.
  • State governments are hit by a double whammy due to lack of technology and an immutable and rigid procurement system.
  • Speedy change is needed is policy: A direction which can accelerate the removal of waste exponentially is needed. One way, used internationally, is to unlock the land value under landfills.
  • Allowing agencies, companies or industry that clear waste, to own the land (fully or partially as per mutually agreed terms) can fund the clean-up.
  • A land payback can be a major incentive to recover the estimated 5,000 acres of prime land taken up by landfills. Rough calculations suggest that the value of the 77 acres of land under the Ghazipur landfill is worth at least Rs 1500 crore.
  • These calculations ignore the socioeconomic benefits of cleaning a site which harbours disease and is a pernicious source of pollution to land, water and air.
  • Skilled and trained professional personnel: The fourth area needing urgent attention is the development of skilled and trained professional personnel to operate and maintain the waste management chain, right from collection, operation and maintenance of waste-handling plants.
  • Zero-waste society: India was traditionally a society where little wasted and everything could be reused and recycled.
    • Sweden is now importing waste for some of its plants and there is definitely value in all the waste generated and any investment needed is an investment for a clean and secure future.
  • Design of waste management should be the bedrock of a well-planned smart city, town or village.
    • Many of the Urban Local bodies are opting for capping i.e. covering up the landfill sites as a solution to this problem.
    • However, this may prove to be an ineffective solution as it leaves methane and leachate to form for decades within the cosmetically covered heap.

Way forward:

  • A well-designed waste-management strategy, cognisant of Indian constraints, will be the hallmark of Swachh Bharat, Swasth Bharat and Unnat Bharat.
  • Science and technology must be the fulcrum to provide solutions to the waste challenges faced by the country, a challenge which is both urgent and important, and can be ignored at our own peril.
  • It is important that the decision-makers at all levels of government opt for more innovative and green approaches rather than falling for the technology-extensive costly methods of waste disposal which are normally being lobbied for by the manufacturers of such technologies.

Source: HT


Pradhan Mantri Suryodaya Yojana

Recently, Prime Minister announced Pradhan Mantri Suryodaya Yojana under which 1 crore households will get rooftop solar power systems. India’s Status of Current Solar Capacity India currently stands at 4th place globally in solar power capacity. As per Ministry of New an

Foreign Contribution Regulation Act (FCRA)- NGO 

The Foreign Contribution Regulation Act, 2010 (FCRA) registration of two prominent non-governmental organisations (NGOs) — Centre for Policy Research (CPR) and World Vision India (WVI) have been cancelled this month. What is FCRA? Key provisions of FCRA, 2010 Key aspects Description

Voice clone-AI

Voice clone fraud has been on the rise in India. AI voice cloning – It is the process of creating a synthetic replica of a person’s voice through machine learning and speech synthesis technology.It is called as voice deepfakesor audio deepfakes. Objective – To achieve a high level of na

Science communication- how to promote

Steps taken by India to promote Science Communication Publications and Information Directorate (PID) - An organisation under Council of Science and Industrial Research (CSIR) established in 1951 for publishing and disseminating scientific information in India. National science magazines- The PI

Universal Basic Income (UBI)- Analysis

Universal Basic Income (UBI) can strengthen welfare architecture and unlock the nation’s latent demographic potential. UBI - It is an income support mechanism typically intended to reach all or a very large portion of the population regardless of their earnings or employment status. Objective- To provide enough to co

Toppers

Search By Date

Newsletter Subscription
SMS Alerts

Important Links

UPSC GS Mains Crash Course - RAW Prelims Answer Key 2024